Required Clearances - GMS (Gas Measurement System) exclusion zone
  • 1 Minute to read

    Required Clearances - GMS (Gas Measurement System) exclusion zone


      Article summary

      Any metering work to be done will require the site to meet Metering GMS exclusion zone compliance as of today's standards. Which means the electrical appliances need to be

      removed/relocated out of the GMS exclusion zone.

      *The Gas Measurement System (GMS) is never to be built over by a deck or enclosed within a building