Any metering work to be done will require the site to meet Metering GMS exclusion zone compliance as of today's standards. Which means the electrical appliances need to be

removed/relocated out of the GMS exclusion zone.

*The Gas Measurement System (GMS) is never to be built over by a deck or enclosed within a building